Green Homes Grant vouchers extended
The Green Homes Grant (GHG) voucher scheme has been extended past 31 July 2021. The GHG may allow vouchers that are already issued to be extended.
Extension requests that are received up to and including 31 July 2021 may be extended for a period of 90 days or until 31 October 2021, whichever is sooner. From the 1 August 2021 extension, requests may be granted but in more limited circumstances than previously.
More information can be found on the scheme webpages.
The main changes are:
Extension requests may still be granted after 31 July 2021 if work has already started on a measure. Vouchers extended after July 31 will expire on 31 October 2021.
If an ongoing installation is further delayed beyond 31 October 2021 for reasons beyond the homeowner’s and installer’s control, it may be possible in some circumstances to grant a short extension request until 30 November 2021.
We understand that some measures have longer lead-times, therefore vouchers for the following measures that were issued after 30 April 2021 will still be granted extensions if they are requested after 31 July 2021, even if work has not started. Extensions will be for 90 days or until 30 November 2021, whichever is earlier.
- Solid wall insulation (internal or external)
- Park home insulation
- Air source heat pump
- Ground source heat pump
- Hybrid heat pump
- Biomass boiler
If a customer has a voucher that expires after 31 July 2021 for a primary measure that has not been redeemed, they can also apply for an extension for any vouchers they have for secondary measures, even if the work on these secondary measures has not yet started. The expiry on the secondary measure will be 31 October 2021 or the same as that of the primary measure, whichever is later.
To understand more about these changes, and if customers are looking to extend their vouchers, customers and installers can get in touch by emailing the scheme administrator at customer@green-homes-grant.service.gov.uk or by calling on freephone 0300 131 0053.
This article originally appeared on the ECA website. It was posted on 29 June 2021.
--ECA
[edit] Related articles on Designing Buildings
- Articles by the Electrical Contractors' Association (ECA).
- Boiler.
- Get ready for green jobs and upgrade projects.
- Government urged to include home energy retrofits in Industrial Strategy.
- Heat pump.
- Insulation.
- Net zero strategy: build back greener.
- Recommendations for implementation of the National Retrofit Strategy.
Featured articles and news
From studies, to books to a new project, with founder Emma Walshaw.
Types of drawings for building design
Still one of the most popular articles the A-Z of drawings.
Who, or What Does the Building Safety Act Apply To?
From compliance to competence in brief.
The remarkable story of a Highland architect.
Commissioning Responsibilities Framework BG 88/2025
BSRIA guidance on establishing clear roles and responsibilities for commissioning tasks.
An architectural movement to love or hate.
Don’t take British stone for granted
It won’t survive on supplying the heritage sector alone.
The Constructing Excellence Value Toolkit
Driving value-based decision making in construction.
Meet CIOB event in Northern Ireland
Inspiring the next generation of construction talent.
Reasons for using MVHR systems
6 reasons for a whole-house approach to ventilation.
Supplementary Planning Documents, a reminder
As used by the City of London to introduce a Retrofit first policy.
The what, how, why and when of deposit return schemes
Circular economy steps for plastic bottles and cans in England and Northern Ireland draws.
Join forces and share Building Safety knowledge in 2025
Why and how to contribute to the Building Safety Wiki.
Reporting on Payment Practices and Performance Regs
Approved amendment coming into effect 1 March 2025.
A new CIOB TIS on discharging CDM 2015 duties
Practical steps that can be undertaken in the Management of Contractors to discharge the relevant CDM 2015 duties.
Planning for homes by transport hubs
Next steps for infrastructure following the updated NPPF.